From first flight to fielded mesh.
We earn each capability with evidence. Every phase has to prove itself before the next one starts — so what reaches the warfighter is combat-credible, not a slide.
Six phases. Each gate cleared with data.
-
01
Learning platform
Fly, break, repair, log. Build the sustainment data before anything scales.
-
02
Field kit
Deployable, operator-run. Prove the deploy / repair / charge workflow in the field.
-
03
Support station
Sustain repeated operations from a supervised charge, repair, and config hub.
-
04
Monitoring node
Remote health and status. Prove node identity and telemetry at distance.
-
05
Emplaced node
Weatherized, unattended. Launch, charge, and relay without an operator on site.
-
06
Integrated mesh
One resilient system. Self-healing routing, coordination, and provenance at scale.
The vision is large. The build stays staged.
We do not attempt the full mesh before single-node sustainment is proven. The hardest problems — unattended power, jam-resilient routing, GPS-denied positioning — are deferred until the layers beneath them work. Each gate is cleared with data, not optimism.
Want to follow the build?
Talk to us about pilots, evaluation, and where Cairnix fits in your program.
Get in touch